Royal Yacht Squadron Yacht Haven
You are here:

PROJECT: Royal Yacht Squadron, Yacht Haven Breakwater
LOCATION: Cowes, Isle of Wight
CLIENT: Royal Yacht Squadron
VALUE: £1 million
PROJECT OVERVIEW: CMP were contracted to carry out the dredging works and the placement of the caisson units, with all works being completed from floating plant.

WORKS DESCRIPTION:

  • 9000 m3 of capital dredging
  • Excavate trench and prepare engineered bed to within 75mm tolerance
  • Transportation of pre-cast caisson units from Southampton to Cowes
  • Installation of 14 No caisson units, weighing from 80 to 110 tonnes
  • Backfilling of caissons using dredging arisings
  • Underwater bolting of caissons utlising CMP's in-house divers
  • Transportation & placement of pre-cast breakwater coping units
  • Controlled partial demolition of existing slipway

PROJECT IMAGES

- To open an image in a new window please click on it.

Description:

Number of Pictures:  of