A13 RMG
You are here:

PROJECT: A13 Fender System
LOCATION: A13 River Lea Bridge Crossing, Camden
CLIENT: RMG JV Construction Ltd
VALUE: £300,000
PROJECT OVERVIEW: CMP were contracted to remove an existing timber fender system and replace with a new steel structure weighing 220 tonnes.

WORKS DESCRIPTION:

  • Remove and dispose of old timber fender system
  • Drive 4 No 900mm diameter support piles into the river bed
  • Prefabricate horizontal tubular supports on site
  • Float supports out under the bridge and lift into position
  • Welders then worked around the clock on low water tides to complete the installation
  • Whole structure painted with two coats of epoxy paint
  • Works carried out under the restraint of overhead power cables

PROJECT IMAGES - To open an image in a new window please click on it.

Description:

Number of Pictures:  of