PROJECT: A13 Fender System LOCATION: A13 River Lea Bridge Crossing, Camden CLIENT: RMG JV Construction Ltd VALUE: £300,000 PROJECT OVERVIEW: CMP were contracted to remove an existing timber fender system and replace with a new steel structure weighing 220 tonnes.
WORKS DESCRIPTION:
Remove and dispose of old timber fender system
Drive 4 No 900mm diameter support piles into the river bed
Prefabricate horizontal tubular supports on site
Float supports out under the bridge and lift into position
Welders then worked around the clock on low water tides to complete the installation
Whole structure painted with two coats of epoxy paint
Works carried out under the restraint of overhead power cables