PROJECT: ABP 202 Berth LOCATION: Southampton Container Port CLIENT: Associated British Ports VALUE: £750,000 PROJECT OVERVIEW: CMP were contracted to demolish and dispose of an 8000 t concrete slab situated 20m underwater.
WORKS DESCRIPTION:
Full hydrographic and sub-bottom survey undertaken
90t long-reach excavator with hydraulic breaker tracked on to 1500t spud-leg barge
Concrete slab, 20m underwater and up to strength C40, broken-out to desired level
Specially strengthened rock bucket fitted to long-reach excavator and broken concrete removed
Concrete disposed of using environmentally friendly methods
Project required the precise movement monitoring of adjacent quay walls
PROJECT IMAGES