PROJECT:  ABP 202 Berth
LOCATION: Southampton Container Port
CLIENT: Associated British Ports
VALUE: £750,000
PROJECT OVERVIEW: CMP were contracted to demolish and dispose of an 8000 t concrete slab situated 20m underwater.

WORKS DESCRIPTION:

  • Full hydrographic and sub-bottom survey undertaken
  • 90t long-reach excavator with hydraulic breaker tracked on to 1500t spud-leg barge
  • Concrete slab, 20m underwater and up to strength C40, broken-out to desired level
  • Specially strengthened rock bucket fitted to long-reach excavator and broken concrete removed
  • Concrete disposed of using environmentally friendly methods
  • Project required the precise movement monitoring of adjacent quay walls