PROJECT: Branksome Chine Outfall LOCATION: Branksome Chine, Dorset CLIENT: Dean & Dyball for Wessex Water VALUE: £850,000 PROJECT OVERVIEW: CMP were contracted to install a 350m length, 800mm dia HDPE outfall pipeline from Branksome Chine beach out to sea.
WORKS DESCRIPTION:
Inshore Works
Sheet piled cofferdam installed stretching 100m out to sea from promenade wall
40m of cofferdam installed in tidal conditions
Up to 5m depth of sand excavated from cofferdam using long reach excavator
End of pipe pulled into cofferdam and attached to promenade wall connection
Pipe installed into cofferdam trench
Concrete mattresses installed over pipeline
Trench backfilled and cofferdam bund removed
Offshore Works
Buoyant pipe pulled out to jack-up barge using marine craft
Pipe sunk to seabed using controlled submersion techniques
Specially designed and developed system which communicates between the pipeline and the long-reach exactor used to dig trench of accurate depth from the jack-up barge
Once pipeline was to desired depth and position, divers used to place concrete mattresses over pipeline
Trench backfilled
Full bathymetric survey undertaken