PROJECT: Darsa Hythe Jetty Refurbishment LOCATION: Darsa US Military Base, Hythe, Hampshire CLIENT: Ministry of Defence VALUE: £700,000 PROJECT OVERVIEW: CMP were contracted to refurbish a 300m concrete jetty within an American Naval Base, including the demolition, fabrication and replacement of the entire concrete deck.
WORKS DESCRIPTION:
Survey existing structure to obtain dimensions for new bespoke pre-cast decking units
Remove and dispose of existing concrete deck
Strip and replace bracings, utilising tidal shift patterns and in-house diving team
Float pre-cast units into position and lift to structure using CMP's floating lifting plant
Fit ancillaries including 80 specially fabricated braces calling for the diamond drilling and coring of 480 holes
PROJECT IMAGES
- To open an image in a new window please click on it.