PROJECT: Deneholm Outfall LOCATION: Blackhall, North Sea CLIENT: Alfred McAlpine VALUE: £320,000 PROJECT OVERVIEW: CMP were contracted to install a 170m long 1200mm diameter outfall pipeleine including riser and diffuser.
WORKS DESCRIPTION:
Construct 1200 ton rock causeway approx 150 metres long
Drive sheet piled cofferdam approx 80m long and install bracing etc.
Excavate trench to a maximum depth 4.5 m within cofferdam and shoreside
Prepare engineered bed
Install 170 metre long by 1200 diameter MDPE pipeline including riser & diffuser, shutters and concrete 30 m3 diffuser anchor block
Break existing outfall pipe and reconnect the new.
Place pipe surround and backfill
Place 1000 ton of amour stone around the diffuser area
Extract sheet piled cofferdam
Remove existing CI outfall including all the support trestles
Remove rock causeway and reinstate the beach