PROJECT: Haslar Marina Wavescreen LOCATION: Gosport CLIENT: Dean & Reddyhoff VALUE: £750,000 PROJECT OVERVIEW: CMP were contracted to part-design and fully construct a 130m long steel framed wavescreen for a 600 berth marina situated at the entrance of Portsmouth Harbour.
WORKS DESCRIPTION:
Assist with the structural design steel framed wavescreen to ensure ease of installation
Install 50 Nr tubular guide piles
Fabricate steel bracing structures ashore and float into approximate position using airbags designed by CMP
Each structure sunk into position over the tubular guide piles using accurate buoyancy control techniques
Grout the steel structure to the tubular guide piles
Install hardwood timber facing to the whole of the structure
Install 200 pontoon mooring piles
PROJECT IMAGES - To open an image in a new window please click on it.