PROJECT: Holyhead Footbridge River Crossing
LOCATION: Holyhead, Isle of Anglesey
CLIENT: Laing O'Rourke
VALUE: £800,000
PROJECT OVERVIEW: CMP were contracted to install rock-socketed piles to support Holyhead footbridge.

WORKS DESCRIPTION:

Phase 1 -

  • Mobilise and position the General Zee jack-up barge
  • Drive casing tubes into rock from jack-up barge
  • Drill socket through casing tubes and clean out debris
  • Install steel reinforcement structures within casing tubes
  • Fill casing with concrete
  • Install pre-cast concrete crossheads on top of piles
  • Place and install pre-cast concrete decking beams

Phase 2 -
  • Continuation of rock-socketed foundation piling works from phase 1 but completed from the shore rather than the jack-up barge