PROJECT: Kessock Beauly Firth Pipeline
LOCATION: Inverness
CLIENT: Morrison Construction
VALUE: £800,000
PROJECT OVERVIEW: CMP were contracted to install a sewer pipe across the Beauly Firth at Inveness.


WORKS DESCRIPTION:

  • Length of pipework 900m (check and confirm)
  • Pipework was pre-fabricated and rolled onto a coil
  • The coiled pipe was deployed from spud-leg barge
  • Weights attached to the pipe to sink it
  • Divers check and confirm accurate deployment of the pipe
  • Backfill with Long Reach excavator from spud-leg barge
  • Permanent Dolphin Watch to ensure minimum disruption to this important local marine mammals