PROJECT: Kessock Beauly Firth Pipeline LOCATION: Inverness CLIENT: Morrison Construction VALUE: £800,000 PROJECT OVERVIEW: CMP were contracted to install a sewer pipe across the Beauly Firth at Inveness.
WORKS DESCRIPTION:
Length of pipework 900m (check and confirm)
Pipework was pre-fabricated and rolled onto a coil
The coiled pipe was deployed from spud-leg barge
Weights attached to the pipe to sink it
Divers check and confirm accurate deployment of the pipe
Backfill with Long Reach excavator from spud-leg barge
Permanent Dolphin Watch to ensure minimum disruption to this important local marine mammals