PROJECT: M27 Junction 3-4 Widening LOCATION: Southampton CLIENT: Costains VALUE: £150,000 PROJECT OVERVIEW: CMP were contracted to install sheet piles along a 4km stretch of the M25
WORKS DESCRIPTION:
Installation of 4,600m2 of sheet piling in five locations in a 4km stretch either side of the M27
Sheet piles ranged in lengths from 6.5m long PU18-1mm to 13.0m long PU22+1mm
Piles driven using a Bauer RTG 16T Telescopic Leader Rig with a MR 105 V variable moment high frequency vibrator
All works undertaken entirely within existing highway to minimise the impact on the environment and surrounding communities
PROJECT IMAGES - To open an image in a new window please click on it.