PROJECT: Poole Bridge LOCATION: Poole, Dorset CLIENT: Poole Borough Council VALUE: £460 000 PROJECT OVERVIEW: With CMP as main contractor, the works completed at the prestigious Poole Bridge are a testament to the company's ability to work in extreme adverse conditions. Indeed 90% of the works were undertaken by our in-house diving team in some of the strongest tidal flows in Europe, in a live shipping lane, often hindered by cramped conditions under the bridge. Despite this the works were completed on time and on budget.
WORKS DESCRIPTION:
Install concrete abutment and associated gabion baskets under bridge in tidal conditions
Denso wrap columns under bridge
Excavate trench accross river span for installation of 2nr utility ducts
Float ducts across river and sink using innovative winch system
Install gabion baskets over pipeline trench
Total diving time approximately 150hrs
PROJECT IMAGES