Poole Bridge
You are here:

PROJECT: Poole Bridge
LOCATION: Poole, Dorset
CLIENT: Poole Borough Council
VALUE: £460 000
PROJECT OVERVIEW: With CMP as main contractor, the works completed at the prestigious Poole Bridge are a testament to the company's ability to work in extreme adverse conditions. Indeed 90% of the works were undertaken by our in-house diving team in some of the strongest tidal flows in Europe, in a live shipping lane, often hindered by cramped conditions under the bridge. Despite this the works were completed on time and on budget.

WORKS DESCRIPTION:

  • Install concrete abutment and associated gabion baskets under bridge in tidal conditions
  • Denso wrap columns under bridge
  • Excavate trench accross river span for installation of 2nr utility ducts
  • Float ducts across river and sink using innovative winch system
  • Install gabion baskets over pipeline trench
  • Total diving time approximately 150hrs