PROJECT: Southend Pier Refurbishment
LOCATION: Southend, Essex
CLIENT: J. Breheny Contractors
VALUE: £1,700,000
PROJECT OVERVIEW: CMP were contracted to completely dismantle and refurbish the fire damaged pier head on the end of the 1.3 mile long historic Southend Pier.

WORKS DESCRIPTION:

  • Remove and dispose of fire-damaged timberwork
  • Construct preformed timber modules and install to existing structure
  • Lengthen damaged piles using splice plates
  • Replace diagonal braces and decking supports
  • All works were undertaken on the damaged pier head 1.3 miles from the shore over a 12 month period, meaning the team had to contend with temperatures as low as -11C and winds of up to 70mph
  • The value of this project excludes the price of materials (supplied by Breheny)