PROJECT: Squadron Marina LOCATION: Poole, Dorset CLIENT: Dorset Lake Shipyard VALUE: £685,000 PROJECT OVERVIEW: CMP were contracted to remove 3 wartime concrete slipways and replace with a completely new-built steel and timber wavescreen.
WORKS DESCRIPTION:
Remove and dispose of 3 Nr concrete slipways
Drive 60 No tubular piles
Fabricate and attach steel frames to piles
Install Ekki timber screen boards to frames (total of 2300sqm)
Dredge 6000m3 of silt
Install sheet piles to landside of the structure
Construct and install 2 Nr steel structure entrance dolphins including fenders