PROJECT: Teignmouth Pier
LOCATION: Teignmouth, Devon
CLIENT: The Grand Pier Company
VALUE: £275,000
PROJECT OVERVIEW: CMP were contracted to widen the leisure pier on two sides to allow the owner to install a new fire escape system required by new fire regulations.

WORKS DESCRIPTION:

  • Drive 24 No 500mm diameter steel piles
  • Prefabricate trusses and associate steels
  • Weld steels to piles and install structural supports
  • 75% of works completed from the beach during low water periods
  • Remainder of works carried out from seaward end using CMP's Spudleg barge