PROJECT: Weston Super-Mare Pier Refurbishment LOCATION: Weston Super-Mare CLIENT: Weston Grand Pier VALUE: £1,5000,000 PROJECT OVERVIEW: CMP were contracted to completely dismantle and refurbish the fire damaged pier head on the end of the 1.3 mile long historic Southend Pier.
WORKS DESCRIPTION:
30m long piles were driven 20m into the sea-bed, of which 5m penetrated into mudstone
Piles driven using a Cx110 hammer and 120t crane working on a 1500t barge
Static load tests carried out on piles to prove 4500Kn dead-load
12 anchor piles constructed into the rock to allow piles to resist 500Kn uplift for the foundation of the new tower